Generator Sizing Calculator for Outdoor Events: Starting Watts and 80% Rule
Calculate the right generator for your outdoor event using running watts and motor starting surge. Covers DJ systems, lighting, catering equipment, commercial refrigerators, and tent AC units. Automatically applies the motor starting watts surge and the 80% load rule before outputting the minimum rental tier. Includes fuel consumption estimate. Free PDF report.
Why Do Outdoor Events in the US Lose Power Mid-Event?
Power loss at an outdoor event — the DJ cutting out mid-song, the catering warming trays going cold, the tent cooling down as the AC stops — is one of the most disruptive failures an event can experience, and it is almost always preventable with correct generator sizing. The failure is rarely a mechanical problem with the generator itself; it is almost always a sizing error where the generator was selected based on the running wattage of the equipment without accounting for the starting surge of motor-driven loads, the 80 percent load rule, or the cumulative addition of all loads simultaneously.
Three systematic errors account for the vast majority of outdoor event generator failures in the US. The first is ignoring starting watts. Every motor-driven appliance — air conditioners, commercial refrigerators, pump systems, catering equipment with compressors — requires 2 to 3 times more watts in the first few seconds of startup than it draws while running steadily. A 12,000 BTU portable AC unit runs at 1,200 watts but demands a surge of approximately 3,000 watts the moment it starts its compressor. If a 3,000-watt generator is running smoothly at 2,200 running watts and the AC kicks in demanding an additional 3,000-watt surge, the generator sees a momentary demand of 5,200 watts against a 3,000-watt capacity. The circuit breaker trips, the generator shuts down, and the DJ, the lights, and the AC all go off simultaneously.
The second error is ignoring the 80 percent rule. Generator manufacturers rate their products for maximum continuous output, but continuous operation at 100 percent capacity causes overheating, accelerated engine wear, and voltage irregularities that damage sensitive electronics over time. The industry standard for permanent and rental generator sizing is to treat the maximum safe continuous load as 80 percent of the rated capacity. A 10kW generator has a practical safe working capacity of 8kW. If your total running load is 7.5kW, a 10kW generator leaves you with only 500 watts of true headroom — far too little buffer for starting surges. This calculator applies the 80 percent rule before outputting the rental tier recommendation, ensuring you have genuine working headroom above your calculated demand.
The third error is forgetting to add all loads. Events with multiple vendors — a DJ, a caterer, a florist using powered displays, a photo booth, a bar with refrigerated beer kegs — accumulate wattage from several independent sources. Each vendor estimates their own needs but nobody totals all the loads and checks whether the single generator can handle the cumulative draw. The result is a generator that is correctly sized for the largest single vendor but undersized for the event as a whole.
Motor Starting Watts: The Most Important Number Most People Ignore
The physics of electric motors explains why starting watts matter so much. When a motor starts, it draws a large inrush current to accelerate the rotor from standstill to operating speed. This inrush current causes a momentary power demand 2 to 7 times higher than the steady-state running current, depending on the motor type, the mechanical load, and the motor design. For AC compressors (the type used in air conditioning and refrigeration), the starting surge is typically 2.5 to 3 times the running watts. This starting surge lasts only a fraction of a second, but it is enough to trip the generator’s overload protection if the generator does not have sufficient rated capacity to absorb the surge. Modern capacitor-start motors have lower starting current than older split-phase motors, but even the best modern compressor motor demands at least 1.8 times its running watts at startup. Assuming that a motor’s starting demand equals its running demand — the mistake most event planners make — routinely leads to generator undersizing and power failure at the worst possible moment.
Generator Sizing Formula: Running Watts, Starting Watts, and the 80% Rule
The correct generator sizing formula for outdoor events involves three sequential steps:
Step 1: Total running watts. Add the running wattage of every piece of equipment that will run simultaneously at the event. Running watts are the steady-state power draw of a device once it has started and is operating normally. Every equipment spec sheet, appliance label, or owner’s manual lists the running (operating) wattage. For devices without clear wattage labeling, use amperage × voltage: a device drawing 8 amps on a 120-volt circuit uses approximately 960 watts.
Step 2: Calculate peak starting demand. Identify all motor-driven loads (air conditioners, refrigerators, pumps, motors). For each, the starting watts are approximately 2 to 3 times the running watts. The critical figure is the peak starting demand — the highest instantaneous draw that occurs when the largest motor starts while all other equipment is already running. This peak demand determines the minimum instantaneous generator capacity. This calculator automatically calculates the peak demand for the motor loads you enter and uses the worse of running total or peak starting demand as the basis for sizing.
Step 3: Apply the 80 percent rule. Divide the required demand watts by 0.80 to get the minimum rated generator capacity. Required demand / 0.80 = minimum generator rated watts. This ensures the generator runs at no more than 80 percent of its rated capacity under full load.
| Common Event Equipment | Running Watts | Starting Watts | Load Type |
|---|---|---|---|
| DJ rig with subwoofer (standard) | 2,000W | 2,000W | Non-motor |
| Live band with PA (small) | 3,500W | 3,500W | Non-motor |
| LED string lights (1,000 ft) | 80–400W | 80–400W | Non-motor |
| LED uplighting (each) | 25W | 25W | Non-motor |
| Electric chafing dish (each) | 600W | 600W | Non-motor |
| Commercial coffee urn (each) | 1,200W | 1,200W | Non-motor |
| Commercial refrigerator (each) | 200W | 600W | Motor (3× surge) |
| 12,000 BTU portable AC | 1,200W | 3,000W | Motor (2.5× surge) |
| 24,000 BTU commercial tent AC | 2,500W | 6,000W | Motor (2.4× surge) |
Standard US Generator Rental Tiers
Generator rental companies in the US stock generators in discrete size tiers. Understanding which tier corresponds to your calculated requirement is essential for planning. The standard tiers for event generator rental and their approximate gasoline consumption at 75 percent load:
| Generator Size | Safe Load Capacity (80%) | Fuel at 75% Load | Typical Event Use |
|---|---|---|---|
| 5 kW | 4 kW | 0.58 gal/hr | Small backyard party, basic DJ and lights |
| 8 kW | 6.4 kW | 0.85 gal/hr | Mid-size wedding, DJ + lights + catering |
| 12 kW | 9.6 kW | 1.30 gal/hr | Large wedding with one tent AC unit |
| 20 kW | 16 kW | 2.00 gal/hr | Full catered event, multiple AC units |
| 30 kW | 24 kW | 3.00 gal/hr | Large outdoor gala, band + multiple AC |
| 50 kW | 40 kW | 4.50 gal/hr | Festival, corporate event with full power |
| 100 kW | 80 kW | 9.00 gal/hr | Major festival, trade show, large venue |
How the Generator Sizing Calculator Works: Load Categories and Output
This calculator accepts inputs across five load categories common to US outdoor events and automatically handles the starting watts surge calculation and 80 percent rule, outputting the minimum rental tier needed for your specific event configuration.
DJ / Music System: Select from pre-configured wattage options based on your setup type. A DJ rig with turntables, mixer, amplifiers, and a subwoofer typically draws 1,500 to 2,000 running watts. A live band with a full PA system including front-of-house speaker towers, monitor wedges, and amplifiers draws 3,500 to 5,000 watts. These are non-motor loads, so running watts equal starting watts and no surge calculation is needed.
Lighting: String light wattage depends heavily on whether you are using LED or incandescent bulbs. Standard LED string lights (the S14 or G40 globe style common at US outdoor weddings) draw approximately 40 to 80 watts per 100 feet. Incandescent string lights draw 100 to 300 watts per 100 feet. For 1,000 feet of LED string lights: approximately 400 to 800 watts. LED uplighting units (the most common choice for tent events) draw approximately 25 watts each at full brightness.
Catering equipment: Electric chafing dishes (used to keep food warm at buffet stations) draw approximately 600 watts each. Commercial coffee urns draw 1,200 watts each. These are resistive heating elements — non-motor loads with no starting surge. Commercial refrigerators are a motor load: 200 watts running but up to 600 watts starting surge per unit. The calculator applies the motor surge factor to refrigerators automatically.
Tent AC units: This is the most critical input for summer outdoor events. Air conditioning compressors are among the heaviest motor loads you will encounter at an outdoor event. A single 12,000 BTU portable AC unit starting its compressor draws 3,000 watts for a fraction of a second — more than an entire DJ rig running continuously. The calculator uses the single worst-case AC starting surge (the largest unit you selected) as the peak demand driver, since all AC units typically do not start simultaneously.
Miscellaneous loads: Enter the total additional running watts for any equipment not covered above. Common miscellaneous loads: photo booth (400 to 600 watts), cash registers and POS terminals (100 to 300 watts each), phone charging stations (500 watts), security cameras and monitors (50 to 150 watts each).
Three Real US Event Generator Examples: Backyard Party to Large Festival
Sarah and James: 80-Guest Outdoor Wedding in Austin, Texas (July)
Sarah and James are powering an outdoor July wedding in Austin with no shore power available at the venue. Their power loads: DJ with full rig (2,000W), LED string lights 2,000 feet (160W), 20 LED uplights (500W), 6 electric chafing dishes (3,600W), 2 coffee urns (2,400W), 1 commercial tent AC unit at 24,000 BTU (2,500W running / 6,000W starting surge). Total running watts: 2,000 + 160 + 500 + 3,600 + 2,400 + 2,500 = 11,160W. Peak starting demand: (11,160 – 2,500) + 6,000 = 14,660W. Peak is higher, so: 14,660 / 0.80 = 18,325W required. Rent a 20kW generator. Fuel: approximately 2.0 gallons per hour at 75% load. For an 8-hour event: 16 gallons. They rented a 20kW generator for $285 for the day from an Austin equipment rental company, including delivery and fuel.
Corporate Picnic: 200 Employees in Chicago, Illinois (June)
A Chicago corporate picnic in a company-owned outdoor space. Loads: live band with PA (3,500W), 3,000 feet of LED string lights (240W), no AC (shaded venue, 75-degree June day), 4 chafing dishes (2,400W), 2 commercial refrigerators for drinks (400W running / 600W start each). Total running: 3,500 + 240 + 2,400 + 400 = 6,540W. Motor surge: each fridge starting while all else runs = (6,540 – 200) + 600 = 6,940W peak. Apply 80% rule: 6,940 / 0.80 = 8,675W required. Rent a 12kW generator. This event did not need AC, which kept the generator size manageable despite the live band. Fuel use: approximately 1.30 gal/hr for a 6-hour event = 7.8 gallons.
Lone Star Music Festival: 1,000 Attendees in San Marcos, Texas
A 1,000-person outdoor music festival in San Marcos, Texas in September. Loads: main stage PA and backline (8,000W), festival lighting rig LED (3,000W), food vendor area with 4 commercial refrigerators (800W running / 600W worst surge), 4 commercial 24,000 BTU AC units for vendor tents (10,000W running / 6,000W worst single surge), large miscellaneous loads (concessions, security, phone charging: 3,000W). Running total: 8,000 + 3,000 + 800 + 10,000 + 3,000 = 24,800W. Peak: (24,800 – 2,500) + 6,000 = 28,300W. Apply 80% rule: 28,300 / 0.80 = 35,375W. Rent a 40kW generator. The festival actually ran two 30kW generators with automatic transfer switching — a redundancy strategy for large events where power failure is not an option. Total fuel for the 40kW-equivalent load over 10 hours: approximately 40 to 50 gallons at $3.80/gallon = $152 to $190 in fuel costs.
What Should US Event Planners Know Before Renting a Generator?
Generator Placement and Safety Requirements
Generator placement at outdoor events is governed by both practical operation requirements and OSHA safety regulations for carbon monoxide exposure. The National Electrical Manufacturers Association (NEMA) and OSHA both prohibit generator operation inside tents, canopies, or enclosed or partially enclosed spaces due to the risk of carbon monoxide poisoning from engine exhaust. US law requires that gasoline or propane generators be placed at least 20 feet from any tent opening, window, or vent. The generator exhaust must point away from the tent and event area. For large tent events, this often means the generator is positioned at the perimeter of the tent complex, which requires careful cable management to run power cabling from the generator to the distribution panel inside the tent without creating trip hazards or exposing cable runs to foot traffic.
The generator noise level is also an important placement consideration. Standard portable event generators produce 65 to 75 decibels at 23 feet — approximately the loudness of a normal conversation to a moderately loud office environment. At an outdoor wedding where a ceremony is in progress, a generator positioned 50 feet from the ceremony area may still be audible during quiet passages. Professional event generators and inverter generators operate at 50 to 58 decibels at 23 feet and are significantly quieter. If your event includes quiet ceremony periods, specify a sound-attenuated generator when booking from your rental company and confirm the noise spec in your rental agreement.
Electrical Hookup: What Your Rental Company Provides
US generator rental companies typically provide the generator with a main circuit breaker panel on the unit and outlets for 120-volt and 240-volt connections. For events requiring distribution of power to multiple separate load areas (DJ booth, catering area, bar station, tent AC units), you will need a temporary power distribution box (commonly called a spider box or power distro) that connects to the generator output and provides multiple 20-amp or 30-amp circuit-breaker-protected outlets. Spider boxes are typically rented separately from the generator, or the rental company includes one in event package pricing. Confirm with your rental company before the event whether the distribution equipment is included in the quote and how many separate circuits are provided.
For events requiring 240-volt loads (some large commercial cooking equipment and commercial AC units operate on 240 volts rather than 120 volts), confirm that your generator and distribution equipment supports 240-volt output. Most event rental generators from 5kW upward provide both 120-volt and 240-volt output. The wattage calculations in this calculator apply equally to 120-volt and 240-volt loads — wattage is voltage-neutral for sizing purposes.
Generator Questions US Event Planners Ask Most
For a typical outdoor wedding with DJ (2,000W), LED string lights (300W), 20 LED uplights (500W), and 4 electric chafing dishes (2,400W): total running watts = 5,200W. No motor loads, so no starting surge issue. Apply 80% rule: 5,200 / 0.80 = 6,500W required. Rent an 8kW generator with comfortable headroom. If you add a 12,000 BTU tent AC unit (1,200W running / 3,000W starting surge): running total = 6,400W, but peak starting demand = (6,400 – 1,200) + 3,000 = 8,200W. Apply 80% rule: 8,200 / 0.80 = 10,250W required. Now you need a 12kW generator. The AC unit alone bumps you up an entire rental tier. For every 24,000 BTU commercial AC added to a wedding event, plan to step up one more generator tier.
Running watts (also called rated watts) are the power a device consumes during normal, steady operation. Starting watts (also called peak watts or surge watts) are the brief, higher power demand that occurs in the first fraction of a second when a motor-driven device turns on and its motor accelerates from standstill to operating speed. Non-motor devices (resistive heating elements, LED lights, electronics) have no starting surge: their starting watts equal their running watts. Motor-driven devices (air conditioners, refrigerators, pumps, power tools) have starting watts 1.5 to 7 times higher than running watts, depending on motor type. For generator sizing, you must account for the worst-case starting surge of the motor loads in your event setup, not just the steady-state running total.
The 80 percent rule states that a generator should not be operated above 80 percent of its rated capacity for sustained periods. Running a generator at 100 percent rated load causes: (1) overheating of the generator head and engine, shortening service life; (2) voltage drops that cause sensitive electronics (DJ equipment, laptop computers, LED lighting controllers) to malfunction or be damaged; (3) higher probability of circuit breaker trips during motor starting surges, since there is no capacity headroom to absorb the surge. The practical result of applying the 80 percent rule: always size the generator so your total running load is 80 percent or less of the generator’s rated kW. This means you need a generator rated 25 percent above your peak demand. This calculator performs this calculation automatically and outputs the minimum rental tier that satisfies the rule.
A standard US DJ setup for a 100 to 200 person outdoor reception typically includes: digital turntables or a controller (20 to 50W), a DJ mixer (20 to 50W), two full-range powered speakers (300 to 600W each), a subwoofer (500 to 1,000W), and various miscellaneous gear (laptop, lighting controller). Total: typically 1,500 to 2,500W for a complete standard DJ rig. For larger events (500+ guests) with multiple speaker stacks and subwoofer arrays: 3,000 to 5,000W. For a small DJ setup using a single Bluetooth speaker or compact party system: 200 to 600W. The DJ wattage is typically specified in the DJ’s equipment list or technical rider. Ask your DJ for their power draw specification when planning generator needs.
Typical gasoline consumption at 75 percent load (the most common operating level for a properly-sized generator): 8kW generator: 0.85 gallons/hour. 12kW: 1.30 gal/hr. 20kW: 2.00 gal/hr. 30kW: 3.00 gal/hr. For an 8-hour outdoor wedding with a 12kW generator at 75% load: 1.30 × 8 = 10.4 gallons. At $3.50/gallon: $36.40 in fuel. For a 20kW generator at the same event duration: $56. Fuel is a minor cost relative to generator rental (which typically runs $150 to $450 per day for 8 to 20kW generators). Most rental companies provide the first tank of fuel as part of the rental rate; confirm whether refueling during the event is your responsibility or theirs.
Yes, but AC units require careful generator sizing due to their high starting surge. A 12,000 BTU portable AC unit runs at 1,200W but surges to 3,000W at startup. If a 3,500W generator is powering other equipment and an AC unit tries to start, the 3,000W surge added to the existing load will almost certainly trip the generator’s circuit breaker. The minimum generator for a 12,000 BTU AC unit alone is a 5kW generator (which handles the 3,000W surge with 80% rule headroom: 5,000 × 0.80 = 4,000W > 3,000W). For a 24,000 BTU commercial tent AC with a 6,000W starting surge: minimum generator is a 10 to 12kW unit for the AC alone. Never add large AC units to a generator’s load without re-running the starting watts calculation to ensure the generator can handle the combined surge.
An inverter generator produces AC power by first generating DC power and then inverting it to AC, resulting in “clean power” with very low total harmonic distortion (THD of 3 percent or less). Conventional generators produce power with THD of 15 to 25 percent. The clean power from inverter generators is safe for sensitive electronics (laptops, DJ controllers, LED lighting systems, audio equipment) that can be damaged or malfunction on dirty power. Inverter generators are also significantly quieter (50 to 58 dB) than conventional generators (65 to 75 dB) and fuel-efficient (they adjust engine speed to match demand rather than running at full throttle). The tradeoff: inverter generators are available in smaller sizes (typically up to 7 to 8kW for consumer/prosumer units) and cost more to rent than conventional generators of the same wattage. For events under 6kW of total load where noise and power quality matter (acoustic performances, elegant dinner parties), an inverter generator is the superior choice. For large events with AC loads and high wattage requirements, conventional industrial generators are the practical choice.
Watts = Amps × Volts. For US standard household voltage (120 volts): an appliance drawing 10 amps uses 10 × 120 = 1,200 watts. For 240-volt equipment: 10 amps × 240 volts = 2,400 watts. For three-phase 208-volt equipment (commercial): Watts = Amps × Volts × Power Factor × 1.732. Most event equipment operates on single-phase 120-volt power. The amperage draw is printed on the equipment label or listed in the owner’s manual as “Rated Current” or “Input Current.” If you know the amperage but not the watts, multiply by the voltage and use the result as the running watts input in this calculator. When in doubt, round up: a 9.5-amp appliance on a 120-volt circuit draws 1,140 watts; round to 1,200 watts for a conservative estimate.
For peak outdoor event season (May through October, especially holiday weekends), book generator rental 4 to 8 weeks in advance. Large generators (20kW and above) are available in limited quantities at most local rental companies and can be booked out for major events months in advance. For the Fourth of July, Memorial Day, and Labor Day weekends, generator availability can become scarce 2 to 3 months before the event in some markets as every outdoor event in the region competes for the same rental fleet. Off-peak events (November through April) can typically book 1 to 2 weeks in advance without issues. Always confirm in writing: the generator size, delivery and pickup time, the fuel arrangement (full tank on delivery or customer-fuels), electrical specs (120/240V, connection type), and whether a transfer switch or distribution panel is included. Get a written confirmation with the generator’s rated wattage as the key spec — some rental companies will substitute a different unit than originally quoted without notifying the customer.
Generator permit requirements for US outdoor events vary by jurisdiction, but the most common requirements include: (1) Temporary power permit from the local building department (required in most US municipalities for temporary electrical installations serving public events); (2) Generator placement approval from the local fire marshal (especially for fuel storage and exhaust direction); (3) Event permit or special use permit from the city, county, or parks department (which typically requires submission of a power plan). For private events on private property with generators under 20kW, permits may not be required, but this varies significantly by local ordinance. For public events, events in parks or public spaces, or events with more than 100 attendees, assume permits will be required and start the application process at least 4 to 6 weeks before the event. Contact your local fire marshal and building department for the specific requirements in your jurisdiction. Rental companies with experience in commercial event work can often advise on local requirements and may have standard documentation to accompany the power plan submission.
For events operating in isolation from the utility grid (no shore power connection), a transfer switch is not required — the generator is the sole power source. Transfer switches are required when you are connecting a generator as a backup to an existing building or utility power supply, to prevent back-feeding power into the utility grid during an outage (which is dangerous for utility workers). For most outdoor event scenarios where the generator is the primary power source for temporary event equipment with no connection to a permanent building electrical system, a transfer switch is not needed. What you do need is a proper distribution panel (spider box) to safely distribute the generator’s output to multiple loads at appropriate amperage levels. Confirm with your rental company whether your event’s electrical configuration requires a transfer switch based on whether any permanent building power is involved.
For 1,000 watts of lighting alone with no other loads: 1,000 / 0.80 = 1,250 watts required minimum. A 2kW generator handles this with comfortable headroom. However, events almost never run lighting as their only load. 1,000 watts of string lighting combined with a standard DJ rig (2,000W) is a 3,000W running total, requiring a 3,750W minimum = a 5kW generator. Add one tent AC unit and the calculation changes significantly (see the AC section). For lighting-only situations like illuminating a garden party or pathway lighting with no other powered equipment, a 2kW inverter generator provides quiet, clean power for up to 1,600W of lighting load and is a practical choice. Most home improvement retailers like Home Depot and Lowe’s sell or rent 2kW inverter generators in the $250 to $400 purchase price range.
A spider box (also called a power distribution box or portable power distro) is a rugged electrical enclosure that connects to the generator output and distributes power to multiple individual circuits through protected outlets. It gets its name from the appearance of multiple power cables radiating outward from the central box like spider legs. For events with more than 2 to 3 power endpoints (DJ booth, catering station, bar, lighting controller, photo booth), a spider box is essential because the generator typically provides only 1 to 2 output connections. Without a spider box, event crews improvise with extension cord power strips that do not provide proper circuit protection for each load, creating fire hazards and circuit overload risks. Spider boxes are typically available as part of the generator rental or rented separately for $25 to $75 per day. For event setups with loads spread across multiple locations (catering on one side of the tent, DJ on the other, lighting throughout), a spider box with at least 4 to 6 protected 20-amp circuits is the professional standard.
Solar-powered event setups are technically possible but remain impractical for most full-scale US outdoor events due to the intermittent nature of solar output and the battery storage required to power high-demand loads consistently. A 10kW solar array in full direct sunlight can produce 10kW of power, but event loads often spike well above the solar array’s steady output during high-demand periods (AC compressor starting, DJ peak output, simultaneous catering load). Battery storage systems large enough to buffer these surges for an 8-hour event are extremely heavy, expensive ($15,000 to $50,000+), and logistically complex to transport. The practical current use of solar at events is for supplemental low-power loads: phone charging stations, accent lighting, information displays. For the core power loads of a full outdoor event (DJ, AC, catering), a diesel or gasoline generator remains the standard choice in the US event market. Hybrid generator/solar systems that use solar to reduce generator fuel consumption are an emerging option at large festivals and sustainable events.
Propane generators burn liquid propane (LP gas) rather than gasoline. The advantages for event use: propane stores indefinitely without degrading (unlike gasoline, which goes stale after 30 to 90 days), propane burns cleaner than gasoline (lower emissions, less carbon buildup in the engine), and propane tanks from a commercial supplier can be easily swapped out mid-event without spilling fuel. The disadvantages: propane generators produce approximately 5 to 10 percent less power output than the equivalent gasoline model due to propane’s lower energy density, propane requires larger fuel containers than gasoline for the same runtime (a 100-pound propane tank = approximately 23 gallons of propane = roughly 20 hours of 10kW runtime), and propane rental infrastructure is less ubiquitous than gasoline at equipment rental companies. For events at venues in areas where gasoline generators are restricted but propane is permitted (some park districts and event venue rules prohibit open-fuel generators due to spill risks), propane generators are the practical alternative. Many professional event generator rental companies stock dual-fuel units that run on either gasoline or propane.
Safe generator connection procedures for outdoor events: (1) Never connect the generator to the event power while the generator is running — start the generator, let it warm up and stabilize at operating voltage, then connect loads. (2) Connect large motor loads (AC units, refrigerators) one at a time, not simultaneously, to avoid simultaneous starting surges. Allow each motor to fully start before connecting the next. (3) Use appropriately rated extension cords and cables — the cord must be rated for the amperage of the load it carries. An undersized cord creates a fire hazard and causes voltage drop that damages equipment. (4) Keep all connections and cable runs protected from foot traffic and water exposure. (5) Do not exceed the rated amperage of any individual circuit or outlet on the generator or distribution box. (6) If you are not experienced with temporary electrical connections for events, hire a licensed electrician to set up the generator distribution. Many US equipment rental companies require licensed electrical setup for generators above 20kW.